VoxJuris
Home › High Courts › Madras High Court 2026 › High Court of Madras

Pooja v. The District Collector

ALLOWED
Court
High Court of Madras
Decided
19 January 2026
Bench
S.M. Subramaniam, C.Kumarappan
Case no.
WP 28424/2025

Follow Madras High CourtFollow S.M. SubramaniamFollow C.Kumarappan

Judgment

ORDER (Order of the Court was made by S.M.Subramaniam J.) `

Writ of Mandamus has been instituted to direct the 1st respondent to take effective measures to stop the construction of temple in Adiyankuppam Village, Vandavasi Taluk, Tiruvannamalai District, Survey No.209 encroaching the pond and subsequently, take appropriate action to restore the pond.

¶2Learned counsel for the petitioner would mainly contend that the respondents 5 to 8 started constructing a temple in Government promboke land which is classified as "Kulam"(water body). Constructions in the water body caused obstructions to the people moving around in that locality. Subsequent to the filing of the writ petition, the authorities have stopped unauthorised constructions. Thus, the writ petition is to be considered. __________Page 3 of 7

¶3Learned counsel for the respondents 5 to 8 would oppose by stating that Temple exists nearby the pond for 35 years and the people of that locality are worshipping the deity. It is renovation of the temple, which is proposed and therefore, the present writ petition is to be rejected.

¶4Learned Special Government Pleader, HR & CE Department would submit that Inspector of HR & CE Department conducted field inspection and a Fit Person was appointed to the temple. New construction is made in a water body and during inspection, the authorities found that there is no pathway to reach the new temple construction. The adjacent land is a patta land, belongs to a private person. In the event of completion of the proposed construction, there is no possibility for creating a pathway. Therefore, there is likelihood of arising law and order issue in that locality, if the patta lands are utilised for the purpose of reaching ongoing construction site. That apart, the new proposed construction is made in a Government promboke land, classified as "Kulam" (water body). The village people are utilising the water body for catering the needs of animals. No permission has been obtained from the competent authority namely, District Collector, for construction of a new temple in Government promboke land, which is a water body. Therefore, the construction is unauthorised. The Fit Person appointed by the HR & CE conducted field inspection and his report reveals that the construction would cause obstructions to the people in that locality and usage of pond for storage __________Page 4 of 7 of water to feed animals in that locality. Beyond this, there is no pathway to reach the proposed construction.

¶5The Tahsildar filed a status report and paragraph No.6 of the report reads as under: I humbly submit that the survey revealed the following factual position: a. On the eastern embankment of the pond, new construction work relating to a Krishna temple is in progress by the village people for the past one year, covering an extent of 0.39 sq.mtr. within Survey No.209. b. An existing Murugan Temple aged 25 years ago maintaining by Thiru.Srinivasa Reddiyar, S/o Krishnaswamy Reddiyar and his family, a place of worship, is located on the southern side of the pond, extending into 0.25 sq.mtr. of Survey No.209 and marginally into the adjoining survey number. c. Two encroachments by way of residential houses are situated on the southern side of the pond, first one is thatched house belonging to family of Thiru.Selvaraj, S/o Vadivel-(1) measuring 0.11 sq.mtr. and second one temporary sheet-roofed house belonging to family of Thiru. Elumalai, S/o Gopal - (2) measuring 0.20 sq.mtr. d. Apart from the above encroachments along the embankment, the central portion of the pond remaining in a depressed condition, retaining the physical features of a water body retaining the physical features of a water body. __________Page 5 of 7

¶6The proposed construction has already been stopped by the authorities. Any such unauthorised construction would result in large repercussions. Thus, the respondents 1 to 4 and 9 to 11 are directed to demolish the incomplete unauthorised construction in water body and restore the pond in its original position for storage of water to feed animals and for the benefit of the people in that locality. If the respondents 5 to 8 proposed to construct any temple, it must be done in accordance with law by identifying a suitable land and by obtaining permission from the competent authority in the manner known to law. Demolition of the unauthorised incomplete construction is directed to be completed within a period of six weeks from the date of receipt of a copy of this order.

¶7With the above directions, the Writ Petition stands allowed. (S.M.S.,J.) (C.K.,J.) 19-01-2026 Index: Yes/No Speaking/Non-speaking order VSI __________Page 6 of 7 To

¶1The District CollectorTiruvannamalai, Tiruvannamalai District

¶2The Revenue Divisional OfficerVandavasi Taluk, Tiruvannamalai District

¶3The TashildarVandavasi Taluk, Tiruvannamalai District

¶4The Village Administrative OfficerAdiyankuppam Village, Vandavasi Taluk, Tiruvannamalai District

¶5ShanthiW/o Narayanan, Adiyankuppam Village, Vandavasi Taluk, Tiruvannamalai District

¶6S.RajaselviW/o Sivakumar Adiyankuppam Village, Vandavasi Taluk, Tiruvannamalai District

¶7DiraiS/o Nondi Adiyankuppam Village, Vandavasi Taluk, Tiruvannamalai District

¶8SivakumarS/o Ponnusamy, Adiyankuppam Village, Vandavasi Taluk, Tiruvannamalai District

¶9The Commissioner,Tamil Nadu Hindu Religious And Charitable Endowments Department, No.119, Uthamar Gandhi Salai, (previously Nungambakkam High Road), Nungambakkam, Chennai - 600 034.

10.The Joint Commissioner,Tamil Nadu Hindu Religious And Charitable Endowments Department, Tiruvannamalai, Tiruvannamalai District.

11.The Assistant Commissioner,Tamil Nadu Hindu Religious And Charitable Endowments Department, Tiruvannamalai, Tiruvannamalai District. WPoNo.o28424oofo2025 S.M.SUBRAMANIAM,eJ. AND C.KUMARAPPAN,eJ. VSI WPeNo.e28424eofe2025 19-01-2026 __________Pageo7oofo7

Case details

Parties and counsel

2026:MHC:224 __________Page 1 of 7 IN THE HIGH COURT OF JUDICATURE AT MADRAS DATED: 19-01-2026 CORAM THE HON'BLE MR JUSTICE S. M. SUBRAMANIAM AND THE HON'BLE MR.JUSTICE C.KUMARAPPAN Pooja, D/o Srinivasan A.K 293/1, Reddiar Street, Adiyankuppam Village, Vandavasi Taluk Tiruvannamalai District, Tamil Nadu 604 403 ..Petitioner(s) Vs 1. The District Collector,Tiruvannamalai, Tiruvannamalai District 2. The Revenue Divisional Officer,Vandavasi Taluk, Tiruvannamalai District 3. The TashildarVandavasi Taluk, Tiruvannamalai District 4. The Village Administrative OfficerAdiyankuppam Village, Vandavasi Taluk, Tiruvannamalai District 5. ShanthiW/o Narayanan, Adiyankuppam Village, Vandavasi Taluk, Tiruvannamalai District 6. S.RajaselviW/o Sivakumar Adiyankuppam Village, Vandavasi Taluk, Tiruvannamalai District 7. DiraiS/o Nondi Adiyankuppam Village, Vandavasi Taluk, Tiruvannamalai District 8. SivakumarS/o Ponnusamy, Adiyankuppam Village, Vandavasi Taluk, Tiruvannamalai District 9. The Commissioner,Tamil Nadu Hindu Religious And Charitable Endowments Department, No.119, Uthamar Gandhi Salai, (previously Nungambakkam High Road), Nungambakkam, Chennai - 600 034. 10.The Joint Commissioner,Tamil Nadu Hindu Religious And Charitable Endowments Department, Tiruvannamalai, Tiruvannamalai District. 11.The Assistant Commissioner,Tamil Nadu __________Page 2 of 7 Hindu Religious And Charitable Endowments Department, Tiruvannamalai, Tiruvannamalai District. (R9 To R11 Suo Motu Impleaded Vide Order Dated 04.08.2025 Made In Wp.28424/2025 By Msj, Tvkj) ..Respondent(s) Directing the 1st Respondent to take effective measures to stop the construction of temple in Adiyankuppam village, Vandavasi Taluk, Tiruvannamalai Distrct survey No 209 encroaching the pond and subsequently take appropriate action to restore the pond and pass For Petitioner(s): Mr.A.Manojkumar For Mr.M.Manimaran For Respondent(s): Mr.T.Arun Kumar, AGP for RR1 to 4. Mr.K.C.Karl Marx, for RR5 To 8. Mr.N.R.R. Arun Natarajan, SGP (HR&CE) for RR9 to 11.

Source: High Court of Madras, through the eCourts High Court services, via the Indian High Court Judgments open dataset by Dattam Labs (CC BY 4.0). Text was extracted from the official PDF and may contain conversion errors. Check the official PDF before relying on it.