Order The petitioner has filed the writ petition seeking direction to the 4th respondent to complete the shifting and replacement of the existing electricity line by considering petitioner representation to the respondents 1 to 4 dated
02.01.2026.
¶2It is the case of the petitioner that they have paid the requisite charges for shifting and replacement of the electricity line and they have installed three new electricity poles on the boundaries of the petitioner's property for shifting and replacement. All of a sudden, the official respondents have stopped the work on the basis of a mere legal notice issued by the 5th respondent, which has not been backed by any orders of Court. Therefore, the petitioner is before this Court. Page3 of 6
¶3Heard both sides and also perused the materials available on record.
¶4It is admitted that the respondents have completed the installation of three number of electric poles for shifting the existing electricity line and these poles are situated at the edge of the petitioner's property, over which, the petitioner has no right. It is clear that the 5th respondent has not obtained any orders from the Court, restraining the installation of the new lines. Merely on the basis of the legal notice, the work has been stopped, that too, after the respondents have received requisite charges from the petitioner for the shifting and replacement of the electricity line.
¶5Since the common pathway is not affected in any manner by the new alignment, the 4th respondent is directed to complete the shifting and replacement of the existing electricity line and if the Electricity Board officials need police protection, the jurisdictional police shall give necessary protection to the EB official on their request. The exercise of laying the electricity line shall be completed within a period of two weeks from today. Page4 of 6
¶6This Writ Petition stands disposed of with the above directions. No costs. 19-02-2026 Index: Yes/No Speaking/Non-speaking order sk Page5 of 6 To
¶1The Superintending Engineer Tamil Nadu Generation and Distribution Corporation Limited, Tiruppur Electricity Distribution Circle, KRPS Tower, BN Road, Tiruppur-641 602.
¶2The Executive Engineer Tamil Nadu Generation and Distribution Corporation Limited, Tiruppur Electricity Distribution Circle, Uthukuli, Chengalpalli, Tiruppur-638 812
¶3The Assistant Executive Engineer Tamil Nadu Generation and Distribution Corporation Limited, Tiruppur Elementary Distribution circle Power Office, Sundakampalayam Post Office, Kunnathur Road, Tiruppur-638 103.
¶4The Assistant Engineer(AE) Tamil Nadu Generation and Distribution Corporation Limited, Tiruppur Electricity Distribution Circle, Kunnathur Town, Kunnathur Road, Tiruppur-638 103. Page6 of 6 P.T.ASHA J. sk 19-02-2026
Case details
Parties and counsel
Page1 of 6 IN THE HIGH COURT OF JUDICATURE AT MADRAS DATED: 19-02-2026 CORAM THE HON'BLE MS. JUSTICE P.T. ASHA Neelavathi ..Petitioner(s) Vs 1. The Superintending Engineer Tamil Nadu Generation and Distribution Corporation Limited, Tiruppur Electricity Distribution Circle, KRPS Tower, BN Road, Tiruppur-641 602. 2. The Executive Engineer Tamil Nadu Generation and Distribution Corporation Limited, Tiruppur Electricity Distribution Circle, Uthukuli, Chengalpalli, Tiruppur-638 812 3. The Assistant Executive Engineer Tamil Nadu Generation and Distribution Corporation Limited, Tiruppur Elementary Distribution circle Power Office, Sundakampalayam Post Office, Kunnathur Road, Tiruppur-638 103. 4. The Assistant Engineer(AE) Tamil Nadu Generation and Distribution Corporation Limited, Tiruppur Electricity Distribution Circle, Kunnathur Town, Kunnathur Road, Tiruppur-638 103 5. P.Soundarapandian S/o.Palanisamy nadar, No.2/22, Velliyampathy, Athiyur Post, Kunnathur Road, Tiruppur. Page2 of 6 ..Respondent(s) Prayer: Writ Petition is filed under Article 226 of the Constitution of India for a writ of Mandamus directing the 4th respondent herein to complete the shifting and replacement of the existing electricity line pursuant to petitioner application No.PGIINB671591381 dated 18.09.2024 and by considering petitioner representation to the respondents 1 to 4 dated 2.01.2026 For Petitioner(s): M/s.Mohammed Rithick S For Respondent(s): Mr.L.Jaivenkatesh, Standing Counsel for R1 to R4
Source: High Court of Madras, through the eCourts High Court services, via the Indian High Court Judgments open dataset by Dattam Labs (CC BY 4.0). Text was extracted from the official PDF and may contain conversion errors. Check the official PDF before relying on it.