O R D E R Heard the learned counsel on either side.
¶2The case of the petitioner is that the respondents have erected three poles on his patta land.
¶3The stand of the respondents is that the poles have been erected only in the pathway leading to cemetery. The respondents categorically state that the poles have not been put up on the petitioner's patta land.
¶4The issue can be resolved in the following terms:- a) The petitioner is permitted to submit an application for conducting survey before the jurisdictional Tahsildar. b) The survey application shall be entertained and survey 3 W.P.(MD)NO.12718 OF 2015 shall be conducted after the petitioner pays necessary charges. Survey shall be conducted in the presence of the officials of TANGEDCO. c) Survey report and sketch will be prepared. If it turns out that the poles are located on the petitioner's patta land, then the poles shall be removed by the respondents to some other site. In other words, the petitioner's patta land shall be cleared of any electric pole. Shifting charges will not arise at all.
¶5I am constrained to issue the direction because of the stand taken by the respondents. The entire exercise shall be concluded within a period of four months from the date of receipt of a copy of this order. This writ petition stands disposed of accordingly. No costs. Consequently, connected miscellaneous petition is closed.
11.09.2023 NCC : Yes / No Index : Yes / No Internet : Yes / No PMU 4 W.P.(MD)NO.12718 OF 2015 To:
¶1The Executive Engineer, Distribution, Tamil Nadu Electricity Board, Valliyoor, Tirunelveli District.
¶2The Assistant Executive Engineer, Distribution, Tamil Nadu Electricity Board, Valliyoor, Tirunelveli District.
¶3The Junior Engineer, Distribution Circle, Tamil Nadu Electricity Board, Valliyoor, Tirunelveli District.
5 W.P.(MD)NO.12718 OF 2015 G.R.SWAMINATHAN,J. PMU W.P.(MD)No.12718 of 2015
11.09.2023
Case details
Parties and counsel
1 W.P.(MD)NO.12718 OF 2015 BEFORE THE MADURAI BENCH OF MADRAS HIGH COURT DATED: 11.09.2023 CORAM THE HONOURABLE MR.JUSTICE G.R.SWAMINATHAN W.P.(MD)No.12718 of 2015 AND M.P.(MD)No.1 of 2015 V.Viyagularaj ... Petitioner Vs. 1. The Executive Engineer, Distribution, Tamil Nadu Electricity Board, Valliyoor, Tirunelveli District. 2. The Assistant Executive Engineer, Distribution, Tamil Nadu Electricity Board, Valliyoor, Tirunelveli District. 3. The Junior Engineer, Distribution Circle, Tamil Nadu Electricity Board, Valliyoor, Tirunelveli District. ... Respondents Prayer: Writ petition is filed under Article 226 of the Constitution of India, to issue a Writ of Mandamus, directing the respondents to remove the all the electric poles erected in the petitioner's property bearing survey No.1650/4 measuring to an extent of 0.89.0 hectare ( 2 acres 20 cents) situated at 2 W.P.(MD)NO.12718 OF 2015 North Valliyoor Village, Radhapuram Taluk, Tirurnelveli District forthwith and adequate compensation for their illegal encroachment in the said property . For Petitioner : Mr.S.Palanivelayutham For Respondents : Mr.S.Dheenadayalan, Standing Counsel. * * *
Source: High Court of Madras, through the eCourts High Court services, via the Indian High Court Judgments open dataset by Dattam Labs (CC BY 4.0). Text was extracted from the official PDF and may contain conversion errors. Check the official PDF before relying on it.