VoxJuris
Home › High Courts › Madras High Court 2023 › High Court of Madras

M.Sakthivel, S/O.Murugaiya v. Tamil Nadu Generation and

WITHDRAWN DISMISSED
Court
High Court of Madras
Decided
11 April 2023
Bench
B.Pugalendhiauthor
Case no.
WP(MD) 23136/2015

Judgment

O R D E R

This writ petition is filed for a Mandamus forbearing the respondents 1 and 2 from disconnecting the electricity service connection No.064050201073.

2.Today(11.04.2023), when the matter is taken up for hearing, the learned counsel appearing for the writ petitioner seeks permission of this Court to withdraw the writ petition and he has also made an endorsement to that effect.

3.Recording the submission made by the learned counsel for the petitioner, this Writ Petition is dismissed as withdrawn. No Costs. Consequently, connected Miscellaneous Petition is closed.

11.04.2023 Index:Yes Internet:Yes vrn To

1.Tamil Nadu Generation and Distribution Corporation Limited, (TANGEDCO) Represented by its Superintending Engineer, Thanjavur Electricity Distribution Circle, Vallam Road, Thanjavur.

2.The Assistant Engineer (O/M/West/Thanjavur), (TANGEDCO) Represented by its Superintending Engineer, Thanjavur Electricity Distribution Circle, Vallam Road, Thanjavur. W.P(MD)No.23136 of 2015 B.PUGALENDHI,oJ. vrn ORDERoMADEoIN W.P(MD)No.23136oofo2015oand MP(MD)oNo.1oofo2015 o

11.04.2023

Case details

Parties and counsel

BEFORE THE MADURAI BENCH OF MADRAS HIGH COURT DATED: 11.04.2023 CORAM: THE HONOURABLE MR.JUSTICE B.PUGALENDHI W.P(MD)No.23136 of 2015 and MP(MD) No.1 of 2015 M.Sakthivel ...Petitioner Vs. 1.Tamil Nadu Generation and Distribution Corporation Limited, (TANGEDCO) Represented by its Superintending Engineer, Thanjavur Electricity Distribution Circle, Vallam Road, Thanjavur. 2.The Assistant Engineer (O/M/West/Thanjavur), (TANGEDCO) Represented by its Superintending Engineer, Thanjavur Electricity Distribution Circle, Vallam Road,Thanjavur. 3.S.K.N.S.Shakappan ...Respondents PRAYER: Writ Petition filed under Article 226 of the Constitution of India, praying this Court to issue a Writ of Mandamus forbearing the respondents 1 and 2 from disconnecting the electricity service connection No.064050201073. For Petitioner : Mr.K.K.Senthil For R1 & R2 : Mr.S.Deenadayalan Standing Counsel For R3 : Mr.A.Arun Prasad

Source: High Court of Madras, through the eCourts High Court services, via the Indian High Court Judgments open dataset by Dattam Labs (CC BY 4.0). Text was extracted from the official PDF and may contain conversion errors. Check the official PDF before relying on it.