- Court
- High Court of Madras
- Decided
- 24 November 2023
- Bench
- G.R.Swaminathan
- Case no.
- WP(MD) 27769/2023
Judgment
ORDER Heard the learned counsel on either side.
¶2The petitioner has been entrusted with the task of maintaining the petition mentioned supply channels. The petitioner had unauthorizedly constructed the petition mentioned retaining wall. The petitioner apprehends that the authorities may demolish the same.
¶3When the matter was taken up for hearing, I wanted to know from the respondents if the retaining wall would obstruct free flow of water. Answer is in the negative. The respondents are apprehending from the manner of construction that the petitioner may put the adjacent space for commercial use. The learned counsel for the petitioner on instructions categorically stated that 80% of the work is over and that after completing the remaining 20%, the authorities can take over the maintenance of the retaining wall. It is further undertaken that the adjacent and adjoining spaces will not be put to any commercial use by the petitioner. This undertaking is recorded.
¶4The Writ Petition is disposed of by permitting the petitioner to complete the balance construction of the retaining wall. No costs. Consequently, connected miscellaneous petition is closed.
24.11.2023 NCC : Yes/No Index : Yes / No Internet : Yes/ No rmi
G.R.SWAMINATHAN, J. rmi To
1.The District Collector,
2.The Executive Engineer, Water Resource Development, Periyaru Vaigai Sub Basin Sub Division, Madurai.
3.The Superintending Engineer, Water Resource Development, Periyaru Vaigai Sub Basin Circle, Madurai.
4.The Assistant Executive Engineer, Water Resource Development, Periyaru Vaigai Sub Basin Sub Division, Uthamapalayam Taluk,
5.The Tahsildar, Taluk Office, Theni.
24.11.2023
Case details
Parties and counsel
BEFORE THE MADURAI BENCH OF MADRAS HIGH COURT DATED : 24.11.2023 CORAM THE HONOURABLE MR.JUSTICE G.R.SWAMINATHAN and W.M.P.(MD)No.23878 of 2023 Palaniappa Pasana Paribala Sabai, Ward-5, Big Street, Palanichettipatti, Theni District, Rep. by its President, Pasupathi Ramkumar ... Petitioner Vs. 1.The District Collector, 2.The Executive Engineer, Water Resource Development, Periyaru Vaigai Sub Basin Sub Division, Madurai. 3.The Superintending Engineer, Water Resource Development, Periyaru Vaigai Sub Basin Circle, Madurai. 4.The Assistant Executive Engineer, Water Resource Development, Periyaru Vaigai Sub Basin Sub Division, Uthamapalayam Taluk, 5.The Tahsildar, Taluk Office, Theni. ... Respondents Prayer : Writ Petition filed under Article 226 of the Constitution of India, praying this Court to issue a Writ of Mandamus, to forbear the respondents herein from in any manner removing the retaining wall constructed in Survey No.1533, Palanichettipatti, Theni District, and consequently direct the respondents herein to consider the representation of the petitioner herein dated 22.06.2023 to allow the petitioner to complete the retaining wall at its cost and vest the same in favour of the Public Works Department. For Petitioner : Mr.K.Appadurai For Respondents : Mr.K.Balasubramani Special Government Pleader
Source: High Court of Madras, through the eCourts High Court services, via the Indian High Court Judgments open dataset by Dattam Labs (CC BY 4.0). Text was extracted from the official PDF and may contain conversion errors. Check the official PDF before relying on it.